<progress id="l5j9b"><font id="l5j9b"></font></progress>

    <dl id="l5j9b"><span id="l5j9b"><rp id="l5j9b"></rp></span></dl><noframes id="l5j9b">

          <var id="l5j9b"><form id="l5j9b"></form></var>
          <form id="l5j9b"><span id="l5j9b"></span></form>

          <thead id="l5j9b"></thead><big id="l5j9b"><progress id="l5j9b"><progress id="l5j9b"></progress></progress></big>

          <menuitem id="l5j9b"><cite id="l5j9b"></cite></menuitem>

             
               
            塑料防震管夾
            管夾
            輕型單螺栓管夾系列
            輕型雙螺栓管夾系列
            輕型雙聯管夾系列
            重型管夾系列
            小型管夾系列
            單管夾—多聯管夾系列
            雙聯式管夾系列
            單面管夾
            方鋼多管徑管夾
            扁鋼管夾系列
            U型管夾系列
            防震管夾系列
            法蘭、接頭系列
            拉緊式管夾系列
            導軌條系列
            Address:Xinfeng Road Development Zone No. 2 Funing
            Contact:Mr. Gu
            Tel:18796586639
            Web:www.dcphknt.com
            NEWS
            Clamp installation program
            2018/6/1 閱讀次數:[502]
            Before assembling the assembly on the welded plate, to better determine the direction of the clamp, it is suggested to mark first at the fixed place, then weld the weld, insert the lower half of the pipe clamp, and put on the fixed pipe. Then put the other half of the pipe clip and cover plate, screw it up. Avoid directly welding the bottom plate that has been loaded.
            On the ground guide, the guide rail can be welded on the base, or fixed with screws, then push the guide nut into the rail and turn 90 degrees. The lower half pipe clamp is embedded in the nut, the fixed pipe is put on, the upper half pipe clamp body and the cover plate are put on the upper half pipe, and the screw is fixed with the screw.
            Stacked assembly, the guide rail can be welded on the base, or screw fixed, first install the lower half of the pipe clamp body, put the fixed pipe on the upper half of the pipe clip, fixed with screws, through the anti loose cover to prevent it from turning. Then install second pipe clips, the same way.
            When assembling the elbow, the elbow should be fixed directly in the front and rear part of the elbow by Custer tube clamp. It is suggested that such points should be fixed position.
             
             
            All rights reserved Jiangsu Rueilong Clamp Manufacturing Co., Ltd. 蘇ICP備10225944號
            Address:Xinfeng Road Development Pho:0515-87283399 Fax:0515-87283378
            波多野结衣办公室33分钟_国偷自产短视频中文版_欧美性爱一级黄片_亚洲国产日韩欧美视频二区

            <progress id="l5j9b"><font id="l5j9b"></font></progress>

              <dl id="l5j9b"><span id="l5j9b"><rp id="l5j9b"></rp></span></dl><noframes id="l5j9b">

                    <var id="l5j9b"><form id="l5j9b"></form></var>
                    <form id="l5j9b"><span id="l5j9b"></span></form>

                    <thead id="l5j9b"></thead><big id="l5j9b"><progress id="l5j9b"><progress id="l5j9b"></progress></progress></big>

                    <menuitem id="l5j9b"><cite id="l5j9b"></cite></menuitem>